MgB2 Superconductor
MgB2 Superconductor Project
Preparing Samples
1) Weigh appropriate amounts of Mg and B powders.
2) Mix and grind powders (in mortar) for ~ 15 minutes.
3) Pack and press the resulting powder into sheathing material.
4) Mechanically deform sample (crush the core) into a slug, ribbon or wire.
5) Heat.